Switchgear Production Line / Switch Cabinet Assembly Line / Cubicle Switchboard Conveyor Equipment The switchgear production line is composed of assembly, testing and packaging lines. 1. Overview: 1.1 Length and hight of automatic production line: 50m and 3.8m 1.2 Switchgears suitable for production: 650/800/1000/1200 cabinet type with max. weight 2000kg 1.3 Daily yeild output: 12 pieces/8hours 2. Configuration: 2.1 The main assembly line adopts type of straight length with a RGV for transmission and work stations deployed beside two sides of the straight line. 2.2 FAT area is set at the end of the production line. 3. Production procedures: 3.1 Panel assembly-installation of meachnism parts & movable guide-earthing switch assembly-installation of mutual inductor-instrument cubicle 3.2 Secondary connection-panel installation-busbar installation-breaker into cabinet 3.3 facility and voltage withstand testing-final check of facility-FAT 4. Features: 4.1 Automatic motor-trolley is electrically driven by sliding contact; 4.2 Barcode localization enables accuracy, stability and self-verification of localization between work stations; 4.3 RGV adopts frequency control to make sure of the stable transimission. 4.4 Assembly line uses module design with flexible deployment.
Drawer of LV Switchgear Cabinet Production Line
Drawer of LV switchgear cabinet is mainly designed by free flow conveyor. It carries out the streamlined operation for each drawer from the housing installation to the final offline. The working stations are allocated according to the working hour of every working procedure, which will balance every working procedure. After the drawer inspection is finished, the line can be coordinated with automated storage & retrieval system by bar scanning to realize the warehouse management.